Kusmawan, I Gede Arya and Nudja S, I Ketut and Jawat, I Wayan (2013) PERENCANAAN METODE PELAKSANAAN STRUKTUR BASEMENT PADA PEMBANGUNAN SEMINYAK HOTEL DEVELOPMENT. Paduraksa, 1 (1). pp. 1-5. ISSN 2303-2693
|
Text
63-115-1-SM.pdf - Published Version Download (163kB) | Preview |
Abstract
Bali is a tourist destination for both local and overseas visitors. One is a natural Travel include mountains, lakes, beaches and other‐other. Tourism is a tourist beach most visited by the visitors due to its panoramic beauty and the many activities that can be done in areas such as surfing beaches and diving, in addition beach is also equipped with facilities such as cafes, villas, restaurants, and others‐others, so make interest for tourism. Hotel construction has more value than being near the coastal region is a place that is close to amenities ‐ amenities such as cafes, shopping centers, restaurants, etc. The issues raised in this research are: 1) What are needed to plan the method of implementation of the work structure of the basement? 2) How to plan the methods of implementation of the work basement structure? 3) How the plan of cost and time of implementation method? The results are: 1) Concrete construction method is cast in place. 2) Total duration required to complete the structural work is 117 days where in the schedule is 230 days. 3) Human resource planning, scheduling of material resources and use of equipment resources planning. 4) Cost implementation is Rp. 13,658,019,687.07 doesn’t include taxes of 10 %.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | methods, costs and time |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Institution of Research and Community Service (LP2M) > Civil Engineering |
Depositing User: | Rees Jati Prakasa |
Date Deposited: | 21 Apr 2016 23:57 |
Last Modified: | 10 May 2016 04:04 |
URI: | http://repository.warmadewa.ac.id/id/eprint/10 |
Actions (login required)
View Item |