Lestari, Ni Putu Novi Esti and Yujana, Cok Agung and Ardantha, - (2013) PERENCANAAN REVETMENT MENGGUNAKAN TUMPUKAN BRONJONG DI PANTAI MEDEWI JEMBRANA. Paduraksa, 1 (1). pp. 1-5. ISSN 2303-2693
|
Text
65-119-1-SM.pdf - Published Version Download (143kB) | Preview |
Abstract
Planning Revetment using stacks of gabions on the Beach Medewi this goal is: to get the construction of coastal Revetment appropriate to address the erosion of the coast of Jembrana Medewi, obtain the total cost required for construction of the Revetment and the time required in the construction. The methods used in planning are: ‐ the location of planning, ‐ data collection methods are: methods of literature, survey methods, methods of documentation, ‐ data type include: wind data, topographic data, and bathymetry , data tides. The result of this planning in the form stacks of gabions Revetment construction cost for Rp. 4,766,639,000.00 to the time of the construction is 180 calendar days.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | revetment, gabions, medewi |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Institution of Research and Community Service (LP2M) > Civil Engineering |
Depositing User: | Rees Jati Prakasa |
Date Deposited: | 22 Apr 2016 00:12 |
Last Modified: | 22 Apr 2016 00:12 |
URI: | http://repository.warmadewa.ac.id/id/eprint/12 |
Actions (login required)
View Item |