METODE FAST & ANALYTICAL HIERARCHY PROCESS DALAM REKAYASA NILAI PADA PROYEK KONSTRUKSI GEDUNG (STUDI KASUS GEDUNG KANTOR BUPATI ALOR)

Syamsudin, Ahmad and Wiranata, Putu Gede and Armaeni, Ni Komang (2013) METODE FAST & ANALYTICAL HIERARCHY PROCESS DALAM REKAYASA NILAI PADA PROYEK KONSTRUKSI GEDUNG (STUDI KASUS GEDUNG KANTOR BUPATI ALOR). Paduraksa, 1 (1). pp. 1-7. ISSN 2303-2693

[img]
Preview
Text
46-82-1-SM.pdf - Published Version

Download (150kB) | Preview
Official URL: http://ejournal.warmadewa.ac.id/index.php/paduraks...

Abstract

In planning a project is necessary and cost analysis functions. This is done to get the optimum planning. An effective method is to apply value engineering, where costs are based on an analysis of the major functions of a project. Application of value engineering in construction projects Kalabahi Regent Office Alor regency is motivated by the limited funds available by the project owner, so that need to find an alternative plan where the initial space which planned requirements remain available to the financial condition of the running. Value engineering methodology used is based on the Value Engineering work plan consists of phase information, creative stage, analysis and recommendation phase. Based on the results of the application of Value Engineering in Construction Project Office Building Bupari Alor, conducted an analysis of 3 (three) items Works Architecture is a high‐cost ceiling jobs, and jobs Wall tile floor can result in a savings of Rp. 118,937,059 or 1.62% of the total project cost.

Item Type: Article
Uncontrolled Keywords: value engineering, design
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Institution of Research and Community Service (LP2M) > Civil Engineering
Depositing User: Rees Jati Prakasa
Date Deposited: 21 Apr 2016 23:43
Last Modified: 21 Apr 2016 23:43
URI: http://repository.warmadewa.ac.id/id/eprint/8

Actions (login required)

View Item View Item