Up a level |
Darmayudha, A. A. Ngurah and Nudja S, I Ketut and Armaeni, Ni Komang (2015) ANALISA PROGRAM PERCEPATAN PADA PROYEK KONSTRUKSI DENGAN METODE PENAMBAHAN JAM KERJA (STUDI KASUS PROYEK PEMBANGUNAN AGRANUSA SIGNATURE VILLA NUSA DUA BALI). Paduraksa, 4 (1). pp. 35-47. ISSN 2303-2693
Armaeni, Ni Komang (2014) KAJIAN ETIKA DAN PROFESIONALISME DALAM BISNIS KONSTRUKSI INDONESIA. Paduraksa, 3 (2). pp. 45-60. ISSN 2303-2693
Syamsudin, Ahmad and Wiranata, Putu Gede and Armaeni, Ni Komang (2013) METODE FAST & ANALYTICAL HIERARCHY PROCESS DALAM REKAYASA NILAI PADA PROYEK KONSTRUKSI GEDUNG (STUDI KASUS GEDUNG KANTOR BUPATI ALOR). Paduraksa, 1 (1). pp. 1-7. ISSN 2303-2693
Runa, I Wayan and Armaeni, Ni Komang and Warnata, I Nyoman (2011) STUDI PERUBAHAN PERMUKIMAN DESA SUKAWANA UNTUK MENINGKATKAN KUALITAS PELESTARIAN DESA KUNO DI BALI. Working Paper. -. (Submitted)