Up a level |
Darmayudha, A. A. Ngurah and Nudja S, I Ketut and Armaeni, Ni Komang (2015) ANALISA PROGRAM PERCEPATAN PADA PROYEK KONSTRUKSI DENGAN METODE PENAMBAHAN JAM KERJA (STUDI KASUS PROYEK PEMBANGUNAN AGRANUSA SIGNATURE VILLA NUSA DUA BALI). Paduraksa, 4 (1). pp. 35-47. ISSN 2303-2693