Up a level |
Darmayudha, A. A. Ngurah and Nudja S, I Ketut and Armaeni, Ni Komang (2015) ANALISA PROGRAM PERCEPATAN PADA PROYEK KONSTRUKSI DENGAN METODE PENAMBAHAN JAM KERJA (STUDI KASUS PROYEK PEMBANGUNAN AGRANUSA SIGNATURE VILLA NUSA DUA BALI). Paduraksa, 4 (1). pp. 35-47. ISSN 2303-2693
Nudja S, I Ketut (2015) RENCANA BIAYA PELAKSANAAN (RBP) YANG PALING MUNGKIN PADA PROYEK KONSTRUKSI DENGAN BANTUAN PROGRAM @RISK. Paduraksa, 4 (1). pp. 1-9. ISSN 2303-2693
Kusmawan, I Gede Arya and Nudja S, I Ketut and Jawat, I Wayan (2013) PERENCANAAN METODE PELAKSANAAN STRUKTUR BASEMENT PADA PEMBANGUNAN SEMINYAK HOTEL DEVELOPMENT. Paduraksa, 1 (1). pp. 1-5. ISSN 2303-2693
Kertamiyasa, I Made Agus and Nudja S, I Ketut and Surayasa, I Nyoman (2013) PERENCANAAN PELAKSANAAN PEMBANGUNAN VILLA TANA DEWA JIMBARAN – BALI. Paduraksa, 1 (1). pp. 1-7. ISSN 2303-2693