Wahyuni, Putu Ika Dokumen Turnitin (Dr Ika Wahyuni). UNSPECIFIED.
|
Text (Turnitin)
TURNITIN_Best Contractor practice innovations in managing risk during the Pandemic.pdf Download (4MB) | Preview |
|
|
Text (Turnitin)
TURNITIN_Disaster Risk Mitigation in The Implementation of Core Construction in Kuwil Kawan.pdf Download (4MB) | Preview |
|
|
Text (Turnitin)
TURNITIN_Risk analysis in the precast concrete industry supply chain.pdf Download (1MB) | Preview |
|
|
Text (Turnitin)
TURNITIN_Risk analysis of toll road KPS project with SSM (Soft System Methodology) at Gempol–Banyuwangi toll road.pdf Download (1MB) | Preview |
|
|
Text (Turnitin)
TURNITIN_The Quantitative Comparison of Grid Re-analysis Rainfall Products, Satellite Rainfall Products, and Hourly Rainfall Gauge Observation over Bali Province.pdf Download (1MB) | Preview |
|
|
Text (Turnitin)
TURNITIN_The usage of a value engineering method for implementing green construction on the post graduate’s building at Warmadewa University.pdf Download (1MB) | Preview |
Item Type: | Other |
---|---|
Depositing User: | I Putu Astina |
Date Deposited: | 02 Mar 2024 01:59 |
Last Modified: | 02 Mar 2024 02:01 |
URI: | http://repository.warmadewa.ac.id/id/eprint/2455 |
Actions (login required)
View Item |